Municipal/Mining Water and Wastewater Specific Experience

  • Complete Wastewater Plant – Full Control System Conversion from iFix to ClearScada, including Controllogix PLCs and Energy Meter tie-ins.
  • Multiple Lift Station upgrades from Micrologix to ScadaPack RTUs including upgrades to Trio Radios.
  • Water Filtration Plant- Electrical Design (Field Check & Redline Vendor packaged drawings as well as produce engineering drawings for miscellaneous projects within the site) to produce “As Built” drawings
  • Municipal- HMI Development of Pump Station Controls with INTELLUTION 2.6 HMI and Motorola RTU
  • Municipal - Remote monitoring system for cavitation of pumps
  • Paper- Thunder Bay Ontario - Designed and implemented PLC & HMI control system for Wet Pulper, Clarifiers, and Effluent Treatment system
  • Municipal- PLC and HMI upgrade for entire plant control system
  • Municipal- Complete SCADA audit and electrical evaluation with full recommendations for areas of critical failure and full drawing set for each remote site
  • Mine- Integration of water treatment and waste water treatment plants to the overall control system architecture
  • Municipal- Complete upgrade of the Wonderware HMI SCADA system
Water